Civil- and Infrastructural

Where we used to have two weeks to demolish a viaduct, today we have to do it in eight hours. Even so, the project is in good hands with Vlasman Sloopwerken. With our thorough, careful work preparations, the suitable methods are considered and put into practice.

It goes without saying that when we remove a viaduct, we do not damage the road surface, railway tracks or waterway below it. We use very well thought-out protective materials to prevent this. The busy road network of the Netherlands also requires that the next morning, there is nothing left to indicate that Vlasman ever removed a viaduct.

Bookmark and Share
Vlasman Demolition on Facebook